cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

i am the number that is 5,000 greater than the smallest number you can make using 6 of the digits
whats 3/5 + 5/9 (fraction) and 4/7 - 2/3
A company sells cookies in 250-gram packs. When a particular batch of 1,000 packs was weighed, the mean weight per pack was 255 grams and the standard deviation
If the length of one side of a square is 12.0 m, what is the perimeter of the square?
What ancient Mesoamerican civilization were known for large stone monuments? a. the Aztec b. the Olmec c. the Maya d. the Inca
How violence used by the characters to deal with their emotions? (the outsiders)?
what is 800 10 times as much as-------
ziggurats were built in the city states of summer as What
What are some fun facts about the number 25?
sixteen action figures are arranged equally on 2 shelves. How many action figures are on each shelf?Model the problem with both an array and a labeled tape diag