carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

which sentences describe characteristics of a sole proprietorship?
A 4 kg block slides down a rough inclined plane inclined at 30° 179009.GIF with the horizontal. Determine the coefficient of kinetic friction between the block
What advantages did the British have over the Americans in the War for Independence?
What is 0.1071 written as a fraction in the simplest form?
Food allergies and food intolerances are the same thing.
$1,000 after 2 years at an interest rate of 3.0% is round up to the nearest cent
pick the word that correctly completes the sentence. they will be _____ to chicago next week. drives drove driving drive
The mating of California condors in zoos is an example of _____. captive breeding habitat removal mandated preservation habitat preservation @Cas_fangirl_14
At a constant temperature, the volume of a gas doubles when the pressure is reduced to half of its original value. This is a statement of which gas law?
If prices rise but income stays the same, what is the effect on the quantity demanded? a. quantity demanded increases. b. fewer goods are bought. c. more goo