In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

5 In your opinion, which are the two main issues of conflict between two any countries who share their borders? ​
2/3 of 2 how do i get this answer
Select a figure from the options which will continue the same series as established by the problem figures.Please help step by step!
If Ally passed her licensing exam on Jan 15,2019 when should she complete her 30 hr Post Licensing course per Indiana guidelines?
What must x equal if g||h? Explain.
text about lebanon's drinking water​
In the adjoining figure, prove A + B + C + D + E = 180° ​
Why are the American people saying that since the 2020 election, American democracy is gone?
Which of the following is not a key factor of competitiveness? a. size of organization b. price . flexibility d. product differentiation e. after -sales service
A cannon fires a shell at 150 m/s at an angle of 20 degrees to the horizontal. How long is the cannon ball in the air if it lands in the ground level with the m