ronieshabrown13
ronieshabrown13 ronieshabrown13
  • 02-12-2021
  • Mathematics
contestada

a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Massachusetts has a 9% sales tax. Timothy bought a Toro lawn mower and paid $36 sales tax. What was the cost of the lawn mower before the tax?
What is 1/6 + (2/3 - 1/4) in simplest form
When changes occur in a DNA sequence, _______ produced from the DNA may not function correctly, and a _______ disease may result. A.proteins, genetic B.carbohyd
Name two types of adaptations having to do with an animals actions
Gregor Mendel’s research formed the basis of the field of genetics. dominance. recessiveness. selective breeding.
What is one reason coral reefs are such diverse ecosystems?
What is the shaking or sliding of Earth’s surface called?
what reference source would you use to find the meaning of "etiquette" this is language arts
Which expressions represent the distance between the two points? Choose all answers that are correct. The number line shows two points with coordinates negati
an equation stating that two ratios and rates are equivalent is a (n)