Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

why are agricultural products hard to grow in north alaska
The height h (in feet) above the water of a cliff diver is modeled by h=-16t^2+8t+80, where t is the time (in seconds). How long is the diver in the air?
how many right angles does a rhombus have?
the stage for a school play is 70 feet wide. A set for the play will be built in two sections, separated by 5 feet in the center. in addition, 3 feet must be le
Use the rules of negative numbers to calculate -6 + -6 - -2
The sum of 4 times a number and 7 is 19
Twelve of the 40 cars pulled by the locomotive were tankers. A. What Fraction of the cars were tankers? B. What Percent of the cars weren't tankers? Thanks So S
When an object moves in a circle, ___ acts to accelerate the object toward the center of that circle
The work output of a machine divided by the work input is the ____ of the machine
According to the cell theory, which structure contains cells? A)blood B)water C)carbon dioxide D)chromosome