15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

a _ is a push or pull
Select the expression that is equivalent to 48 + 12. 6(8 + 6) 12(4 + 1) 4(44 + 3) 8(6 + 4
One grain of this sand approximately weighs 7 x 10^-5 grams how many grains of sand are there in 6300kg of sand? answer in standard form.
Brainly says that I should be recieving unlimited answers due to homeschooling, but its still making me either pay or watch videos to see answers :( What do I d
Please help with these questions ASAP: The Giver
Ross drives 280 miles in 4 hours. If Ross continues to drive at the same rate, how many miles can he drive in 12 hours?​
Question 1 of 102 PointsWhich of the following is the coefficient in the algebraic expression 5y-z^3?O A. zO B. 3O C. уO D. 5​
“An inspector calls” questions
Find the slope of the line joining the points A (–3, 2) and B (0, 4)
As an auditor for Bernard and Thomas, you are responsible for determining the proper classification of income statement items in the audit of California Sports