The main outputs of which process are a quality management plan, quality metrics, project management plan updates, and project documents updates?

Respuesta :

PiaDeveau PiaDeveau
  • 09-07-2021

Answer:

Process asset updates.

Explanation:

Quality assurance assessments, validated modifications, authenticated deliverables, performance at work indicators, configuration management, project management plan modifications, project document security patches, and organisational process asset updates are the key outputs of quality assurance.

Answer Link

Otras preguntas

After the bite of the tsetse fly, parasites multiply in the blood of animals and _____. a. human’s blood b. of humans
which of the following is NOT a unit of measurement?a.literb.kilometerc.scaled.kilogram plz answer
1/4+1/2 find the sum using number line
what does w equal? 1=-(-w 6) a. 3b. -7c. 7d. -3
plural possessive of, the gardeners left their tools in the driveway
who had the biggest conbution to the american revolution; african americans, native americasns or woman
A baseball is thrown a distance of 20 meters what is its speed if it takes 0.5 seconds to cover the distance?
What are the characteristics of living things?
Which Amendment states that all rights not granted to the federal government by the U.S. Constitution are reserved for the states and the people in them? A. the
what is the theme of the story survivors of the dust bowl