KillaZayy4849 KillaZayy4849
  • 01-06-2021
  • Business
contestada

Describe a master budget and the sequence in which the individual budgets within the master budget are prepared.

Respuesta :

neilsimonjadormeo0
neilsimonjadormeo0 neilsimonjadormeo0
  • 03-06-2021

Answer:

The production budget is needed to figure out direct materials, direct labor and manufacturing overhead budgets. Once these are all done, then comes the finished goods inventory budget. Once all of these budgets are done, we can do a cash budget, income statement and balance sheet to finish off the process.

Explanation:

thank me later

Answer Link

Otras preguntas

first the question must be asked are we building on an empty lot or are we replacing an old building if it's the latter we must face the decision of completely
why were African Americans still not free even though President Lincoln effectively ended slavery 100 years prior
The body of a composition___
which is more likely to not appear on the map
Eve plays basketball. She makes 6 free throws for every 3 free throws that she misses. If she missed 27 free throws at her last practice, how many free throws d
Help!!!!! Which of the following would NOT characterize allopatric selection? A physical barrier within population. B. extensive gene flow. C. chromosomal chang
Which expression is equivalent to 25a+5b-13
What is the volume of a sphere with a radius of 21 units? A. 9261 pie units 3 B. 12,348 pie units 3 C. 588 pie units 3 D. 37,044 pie units 3
how is a virus tagged for destruction
(Being a monster?) how to transfer into indirect speech? ​