A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

Simplify each expression by combining like terms.[tex] - 65x + 4.2y + 65x - 2.2y + 5.4 + y - 3y[/tex]​
Nicole is preparing to run in a marathon. Every morning she runs 5 miles in 45 minutes. At that rate, approximately how far could she run in 120 minutes?
4. What was the racial philosophy advocated by Booker T. Washington?
Who was Cousin Ike Finch
In a shipment of 400 parts 14 are found to be defective how many defective parts should be expected in shipment of 1000
Please answer the picture below.
Use the equation y=s x 4 −16 s 3 y=sx4−16s3 to answer the question. How can you rewrite the given formula to correctly isolate x x ? Having trouble understandin
) Debbie solved the linear equation 3(x + 4) - 2 = 16 [Line 1] 3(x + 4) - 2 - 16 [Line 2] 3(x + 4) = 18 [Line 3] 3x + 4 = 18 [Line 4] 3x = 14 [Line 5] x=44 An e
A painter used 3/8 gallon of paint for one job and 1/3 gallon for another job. How many gallons of paint did the paint use for both jobs. A) 4/11 gal B) 17/24 g
Select all the correct images Which organisms undergo Carnegie stages?