It takes 2 workers 6 days to paint a mansion. How many days would it take 4
workers to do the same job?

Respuesta :

dontmindme3
dontmindme3 dontmindme3
  • 01-03-2021

Answer:

2 workers = 6 days

4 workers = 3 days

Step-by-step explanation:

If it takes 2 workers 6 days, if you seep up the process with 4 workers, you would divide the days by 2 because you multilpied the workers by 2. So, it would take 3 days with 4 workers. I hope that makes sence.

Answer Link

Otras preguntas

What thorium has 90 protons and 137 neutrons?
The box is 2.1 feet long,2.7 feet wide and 3.2 feet high. What is closest to the total surface area of the box?
1. Alexi is a very strong swimmer, but she has an injury that prevents her from diving into the pool. What accommodation can be made to help her compete with ot
How does the concept of “idealization” contribute to the author’s key argument regarding crushes?
A parcel is traveling on a horizontal conveyer belt moving at 1 meter/second. At the end of the conveyor belt, the parcel lands on a tray after 1 second. Calcul
What is the coefficient of the variable 2/9j+2/3?
3400 x 1/10 pls help me and show your work
Which does NOT describe an inference? Question 1 options: An educated guess Taking what you see and adding what you know to draw a conclusion Summarizi
What type of photography is mostly likely to be seen on websites and in advertising
Is the godfather based on a book?