When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Ren has a bag of trail mix made of 54 total pieces of nut or dried fruit There are 11 nuts for every 7 fruits, Complete the table. Original ratio | Number in t
A type of transport protein that binds to their solute and undergoes conformational changes.
The book The History of Ocean Basins, which contained the idea of seafloor spreading, was written by geologist ________.
please help with #12 im confused that is the key but i dont get it
help Evaluate each expression for d = -3.
HELP, Find x and the length of BD
The steps to convert to a decimal are shown below: *Image*In what step is the first error?Step 1Step 2Step 3Step 4​
Guys I need your help !!!
Help please ! It’s geometry
Can someone plz help me? :(