melanyperez890 melanyperez890
  • 02-11-2020
  • Mathematics
contestada

How much does programmer charge for a coding project that takes 6 hours?
A computer charges $45 an hour for coding projects plus start-up fee of $150

Respuesta :

25tristanme
25tristanme 25tristanme
  • 02-11-2020

Answer:

150 + 45h

Explanation:

Hope this helps.

Answer Link

Otras preguntas

Solve for v 14v-8v=24
If a source of sound waves is rapidly approaching a person, the sound heard by the person appears to have
Tiny structures in the cell that carry out the cell's activities are mitochondria nucleus organelles cyotplasm
Which of the following equations is not in function notation? A. f(x) = x + 3 B. w(r) = 9r - 7 C. y = kx D. C(w) = w/4
Find an implicit and an explicit solution of the given initial-value problem. (use x for x(t).) dx dt = 2(x2 + 1), x(π/4) = 1
Find the surface area of each figure to the nearest tenth. Show your work, please
The points in a coordinate plane are reflected in the y-axis. In general, every point (x, y) is mapped onto what point? (___,___)
The state of matter with a specific volume but no definite shape is the _____ state.
What did the Alianza Federal de Mercedes want?
Individuals receiving anticoagulant therapy with warfarin should be instructed to monitor their consumption of foods high in vitamin k because