jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

the country's population is increasing by 5% how many years will it take the countrys population to double??? (anyone good at maths)​
the main reason for the cut in oil production by opec was its goal of maximizing oil profits through
Draw 2 similar polygons and show how they are proportional by labeling the side lengths and angles. Use a similarity sentence to show how they are similarsimila
What is a good hypothesis for this question do you think that the marketing to children is a social problem? What are some variables that I could be testing? Al
A brand new filled jar of salsa is 11 cm tall and a has a radius of 6 cm. Kelly eats some of the salsa and the salsa in the jar is now 6 cm high. Approximately
What is the area of a circle with a diameter of 8 meters (use 3.14 for ð)? A. 50.24 square meters B. 78.25 square meters C. 200.96 square meters D. none of the
(1) Reality show producers who give their "actors” scripts are not being unethical because everyone knows that the shows are scripted. (2) In the past few year
Simplify. - 4 (3 -1) + 2
Classify the following triangle ​
in the school chorus,2/5 of the students are fourths graders and 1/3 of the students are fifth graders.If there 45 students in chorus,how many students are eith