Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

How would you solve the following question? Evaluate x2y3 - 2(x + 1)2 for x = -3 and y = 4.
What is the value of K?
Nee de idnfisneudnwshosbdiebdkdne
Write a summary of "The Grand Mosque of Paris." A summary is a concise, complete, and accurate overview of a text. It should not include a statement of your opi
8. What was Total War during WWI?
The Law of Conservation of Mass states that in a chemical reaction, atoms are not created or destroyed. True or false question btw
ill give a brainelest Analyze Data- Which two crops were most widely and rapidly adopted? . Single line text.
If you read another article that was focused just on Tom Thumb, which of these sentences would work as a main idea? Tom Thumb was not the only little person to
What is the correct answer?
What was a reason the town voted to bring beavers in to help with the danger of the flooding problem in Leith?