Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

What factors contributed to the growth of silk road answer?
Identify which of the statements is true. −36.5 > −36.07 −2.6 > 2.521 −8.0329 > −8.045 −0.4 > −0.004
"the sum of the digits of a two-digit number is 13. reversing the digits produces a number that is 9 less than the original number. what is the original number?
compare the state of plasma to the other states of matter
What are some hyperbole in Egypt game
Which student would best be helped by using a thesaurus? Chloe needs to find an in-depth definition of unruly. Eric is looking for antonyms for the word boring.
Al2O3 + Fe Yields Fe3O4 + Al need before tomorrow
The burlington company has 12,000 units in beginning finished goods. if sales are expected to be 60,000 units for the year and burlington desires ending finishe
What type of writing in james t. farrell lonigan?
What are the advantages and disadvantages to using an isometric pictorial compared to using an oblique pictorial in technical drawings