pineapplebby21
pineapplebby21 pineapplebby21
  • 02-02-2019
  • Mathematics
contestada

it takes 20 people 24 days to build a barn. in how many days will the barn be built if they had 32 people working

Respuesta :

bluevortexwitepower bluevortexwitepower
  • 02-02-2019

Answer:

15 days

Step-by-step explanation:

Number of ppl it takes to build a barn in 24 days=20

Time it will take 32 people to build the barn=24*20/32=15 days

Answer Link

Otras preguntas

A. -1/4 + 2/3= B. 1/2-3/5-1/2=C. 3/4 of 2/9=D. 2/5 of 7/12=please help me with explanation as well ​
write a short note on Lever and Pulley each​
Being thus passed the vast ocean, and a sea of troubles before in their preparation (as may be remembered by that which went before), they had now no friends to
Sheila is on a temporary layoff from her automobile factory job but has not looked for work in the last four weeks. The Bureau of Labor Statistics counts Sheila
the ratio of 10:25 in its simplest form?
In adults, red bone marrow is located in ______. Multiple select question. the sternum the ribs vertebrae skull bones the diaphysis of the humerus
The process where the programmer steps through each of the program's statements one by one is called
In a well-known study of California men, being aggressive and impatient was found to be related to ________, which shows that ________
G(x)=√8x​ What is the domain of g?
What conclusion can be drawn concerning an inhibitor if the Km is the same in the presence and absence of the inhibitor