batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

d=rt for t........................
round to the nearest hundredth. 84.562
7,000 is ten times as much as what number?
Which of the following is not a famous Spanish artist?a.Kahloc.Goyab.Picassod.Dalí
Rename the number 24 ten thousands
A ray of light strikes a mirror. The angle formed by the incident ray and the reflected ray measures 90 degrees. What are the measurements of the angle of inci
How is 4/10 and 4/100 the same
Square root 2 is between 1.4 and 1.5
Rename the number 4 thousand 7 hundreds = 47
What is the value of the digits 4 in the number 84,230