Kristina recently hired a contractor to do some necessary work. On the final bill, Kristina was charged a total of $765. $405 was listed for parts and the rest for labor. If the hourly rate for labor was $80, how many hours of labor was needed to complete the job?

Respuesta :

TheBreeze
TheBreeze TheBreeze
  • 04-09-2018

405 + 80t = 765

80t = 360

t = 4.5

It took the laborer 4.5 hours

Answer Link

Otras preguntas

×+28=53 what is the value of ×
which of the following sentences is an adverb used correctly She is a beautiful singer She sand beautifully She sang a beautiful song She sang the song beautifu
What is a equipment fraction to 10/20
What is the length of the segment connecting the points 7 5 and 5 2?
The rocket coaster has 15 cars, some that hold 4 people and some that hold 6 people. there is room for 72 people altogether. how many 4 passenger cars are there
The view that human emotions are universal has been supported by the studies of
Why can't you eat or drink before wisdom teeth removal?
What is also known as a visual aid in a presentation? A: Background B:Animation C:Review D:Slide
The sum of two consecutive odd integers is −144. find the two integers.
What term applies to a line that intersects two other lines?